Blueprints and Schematics

BuildingBlueprint LinkLocationTitleContractorDateWhats Inside?Renovation?Decription
100Drawer 3Bldg 100 Welding Shop Exhaust SystemSmaller papers taped together to make a single page . Hand drawer
100East Wing Fire PlansSouth West Design Associates2012, December 3Fire PlansYes > 5'x1' 2 long pieces of white paper rolled together
100Open BookDrawer 1Main Building Relay LocationsRelay LocationsNo>2'x1' Yellow single paper
100Drawer 11970 Great Plains Area Vocational - Technical School1970, January 6Architectural, Structural, Mechanical, Electrical.No>2'x1' Original Building 100 plans, old
100CopyDrawer 11970 Great Plains Area Vocational - Technical School1970, January 6Architectural, Structural, Mechanical, Electrical.No>2'x1' Original Building 100 plans, old missing cover page
100Copy Drawer 11970 Great Plains Area Vocational - Technical School1970, January 6Architectural, Structural, Mechanical, Electrical.No>2'x1' Original Building 100 plans, old and held together with binder clips.
100Drawer 1Electric Floor Plan Area 3Before 2000?????Electrical Plans for the front of Building 100. Before the garage renovation.No>5'x1' one long sheet of paper taped together will be folded over with no cover page.
100Open BookDrawer 21996 Addition and Renvovation to Building 1001996, July 2Architectural & Structural
Cafeteria and Kitchen
Yes>2'x1' Black writting looks new. Cover page has the title in the middle and the index is underneath.
100 Open BookDrawer 21974-75 Expansion Program1975, January 20Architectural, Structural, Mechanical, Electrical Yes>3'x2' with purple writing. Will be folded in half in drawer. with building picture on the front of it.
100 CopyDrawer 21974-75 Expansion Program1975, January 20Architectural, Structural, Mechanical, Electrical Yes>3'x2' with purple writing. Will be folded in half in drawer. with building picture on the front.
100 CopyDrawer 21974-75 Expansion Program1975, January 20Architectural, Structural, Mechanical, Electrical Yes>3'x2' with purple writing. Will be folded in half in drawer. with building picture on the front.
100Drawer 2Remodel Offices Floor Plan & West Wing Floor PlanSouth West Design AssociatesFire Walls, Remodel Detentions Yes>2'x1' with purple writing. No cover sheet but office floor plan is smaller than the west wing plans (1'x1'). All are stapled together.
100 CopyDrawer 21974-75 Expansion Program1975, January 20Architectural, Structural, Mechanical, Electrical Yes>3'x2' with purple writing. Will be folded in half in drawer. with building picture on the front.
100Drawer 21996 Addition and Renvovation to Building 1001996, July 2Architectural & Structural
Cafeteria and Kitchen
Yes>2'x1' Black writting looks new. Cover page has the title in the middle and the index is underneath.
100CopyDrawer 21996 Addition and Renovation to building 100SRLewis Architect1996, July 10Site, Architectural, Structural, Mechanical, ElectricalYes>2'x1' with purple writing. Cover page has the title in the middle off the page with the index at the bottom.
100CopyDrawer 21996 Addition and Renvovation to Building 1001996, July 2Architectural & Structural
Cafeteria and Kitchen
Yes>2'x1' Black writting looks new. Cover page has the title in the middle and the index is underneath.
100Open BookDrawer 2Student Lounge ExpansionPhillip H. Burk & Associates1988, August 17Architectural, Site, Mechanical, ElectricalYes>2'x1' with purple writing. In the top left corner the GP logo, with index of drawings in the bottom right corner.
100Drawer 274-75 Expansion Program1974Floor, and Roof plansYes<3'x2' cover page ONLY has title on it. Thin
100Drawer 2Remodel Offices Floor Plan & West Wing Floor PlanSouth West Design AssociatesFire Walls, Remodel Detentions Yes>2'x1' with purple writing. No cover sheet but office floor plan is smaller than the west wing plans (1'x1'). All are stapled together.
100Drawer 2Student Lounge ExpansionPhillip H. Burk & Associates1988, August 17Architectural, Site, Mechanical, ElectricalYes>2'x1' with purple writing. In the top left corner the GP logo, with index of drawings in the bottom right corner.
100Drawer 3Platform Plan & DetailsBrune Engineering2001, April 11Wielding Elevated PlatformYes>2'x1' Purple writing no cover page
100 Drawer 3Building #100 South Wing AIP Architects in Partnership1997, July 17Re-RoofingYes>2'x1' Cover page is a key map, with purple writing.
100Drawer 3West Wing DDC control Wiring Schematics & Thermostats PANCODDC Control Wiring>4'x3' Loose papers held together with paper clips.
100Drawer 3Proposed Student Lounge Addition (never built) Drawn by: Steven Moralrs
Drafting Class
Never BuiltYes>2'x1' Black Writing. Cover page has the GP logo with " Great Plains AVTS" underneath
100Drawer 3HVAC Renovation Great Plains Technology CenterHSA Engineering 2013, March 20Mechanical Yes>2'x1' Black writing with title in the middle and index in the top right corner
100CopyDrawer 3HVAC Renovation Great Plains Technology CenterHSA Engineering 2013, March 20Mechanical Yes>2'x1' Black writing with title in the middle and index in the top right corner
100 Drawer 31973 Construction Program Parking Area Building Addition James Marshal Consulting Architect. Justice R Neale Professional Engineer.1973Parking lot, Student Lounge Add OnYes>2'x1' No cover page, with purple writing.
100 Drawer 3Building #100 Parking ImprovementsLandmark Engineering1992, September 17Location & Detail SheetYes>2'x1' No cover page with purple writing.
100Drawer 3Painted Closures, Decking HatchM & O Metals Inc.2000, November 17Painted Closures & Decking HatchYes2'x1' No cover page with purple writing
100Drawer 3Hand drawn plan of garage 131Hand drawn plan of garage 131Yes>2'x1' Single sheet
100Drawer 3HVAC Renovation Great Plains Technology CenterHSA Engineering 2013, March 20Mechanical Yes>2'x1' Black writing with title in the middle and index in the top right corner
100 Drawer 31973 Construction Program Parking Area Building AdditionJames Marshal Consulting Architect. Justice R Neale Professional Engineer.1973Parking lot, Student Lounge Add OnYes>2'x1' No cover page, with purple writing. Pages have a orange brown tent
100Drawer 3Addn to Great Plains Vo-Tech School Foundation PlanW & W Steel Company1974, November 24Foundation Plan (For Approval Only!!)Yes>3'x2' Purple writing no cover sheet. Only 3 pages (For Approval Only!!)
100Drawer 3 Construction Program 1977J.R.Neale1977AsphaltYesRice Paper. missing page 1 and 4 (out of 4)
100Drawer 3Welding and Auto body shop 19761976Drainage, Electrical, MiscYesNo cover page. Yellowed with age. No page numbers. Notes written all over it.
200Drawer 4Adult Education Center D.C. Relay LocationsD.C Relay LocationsNo<2'x1' Yellow single sheet
200CopyDrawer 4Adult Education CenterTed Horton AIA Architect 1979, March 1Site, Architectural, Structural, Mechanical, Plumbing, ElectricalNo>2'x1' with purple writing, with a purple windmill in the left corner.
200CopyDrawer 4Adult Education CenterTed Horton AIA Architect 1979, March 1Site, Architectural, Structural, Mechanical, Plumbing, ElectricalNo>2'x1' with purple writing, with a purple windmill in the left corner.
300Drawer 5Seminar CenterAIA Arechitect1986, June 16Site, Architectural, Structural *Missing Mechanical and Electrical*No>2'x1' purple writing. Looks really old with ripped pages. Cover page is ripped on the left side. the title in in the top left corner with the index in the right corner. A red 45 is in the bottom right corner.
300CopyDrawer 5Seminar CenterTed Horton AIA Architect1986, June 16Site, Architectural, Structural, Mechanical, Electric, Plumbing No>2'x1' with Purple writing. Cover Page has no images with Index in the bottom right hand corner and 41 written in red in the way bottom right corner.
300CopyDrawer 5Seminar CenterTed Horton AIA Architect1986, June 16Just ArchitecturalNo>2'x1' with Purple writing. Cover Page has no images with Index in the bottom right hand corner and 35 written in red in the way bottom right corner.
300Drawer 61997 Restroom addition Seminar Building 300SRLewis Architect1997, April 1Site, Architectural, Mechanical, Electrical,Yes>2'x1' purple writing. Cover page has title in the middle and index underneath. In the bottom right corner in black sharpie is #2
300CopyDrawer 61997 Restroom addition Seminar Building 300SRLewis Architect1997, April 1Site, Architectural, Mechanical, Electrical,Yes>2'x1' purple writing. Cover page has title in the middle and index underneath. In the bottom right corner in black sharpie is #1
300Drawer 6Roof Replacement Seminar CenterHTB Inc.1995, August 8West side of 300 roofYes>2'x1' Purple writing. No cover page, shows outline of the west side of 300
300Drawer 61997 Restroom addition Seminar Building 300SRLewis Architect1997, April 1Site, Architectural, Mechanical, Electrical,Yes>2'x1' purple writing. Cover page has title in the middle and index underneath.
300CopyDrawer 6Roof Replacement Seminar CenterHTB Inc.1995, August 8West side of 300 roofYes>2'x1' Purple writing. No cover page, shows outline of the west side of 300
300 & 600Drawer 23Additions to Building 300 & 600 HTB Inc1994, August 17Architectural, Structural, Mechanical, Electrical, Plumbing Yes>3'x2' Purple writing. Cover page has the GP logo in the left corner. Writing in the bottom left corner is a black 13 written in Sharpie.
300 & 600CopyDrawer 23Additions to Building 300 & 600 HTB Inc1994, August 17Architectural, Structural, Mechanical, Electrical, Plumbing Yes>3'x2' Purple writing. Cover page has the GP logo in the left corner. Writing in the bottom left corner is a black 16 written in Sharpie.
300 & 600 Drawer 23Fire Sprinkler PlanP & L Protection Inc.1995, February 24New wing of 600 (West Wing), Student Lounge 300Yes>4'x3' Purple writing only one page folded into 8ths.
300 & 600Drawer 23Additions to Building 300 & 600 HTB Inc1994, August 17Architectural, Structural, Mechanical, Electrical, Plumbing Yes>3'x2' Purple writing. Cover page has the GP logo in the left corner. Writing in the bottom left corner is a black 13 written in Sharpie.
300 & 600CopyDrawer 23Additions to Building 300 & 600 HTB Inc1994, August 17Architectural, Structural, Mechanical, Electrical, Plumbing Yes>3'x2' Purple writing. Cover page has the GP logo in the left corner. Writing in the bottom left corner is a black 17 written in Sharpie.
300 & 600CopyDrawer 23Additions to Building 300 & 600 HTB Inc1994, August 17Architectural Yes>3'x2' Purple writing. Cover page has the GP logo in the left corner.
300 & 600CopyDrawer 24Building 300 and 600 Renovations Renaissance Architects + engineers 2013Architectural Yes>3'x2' Black writing. cover page has Architectural Abbreviations, Drawing Index, and Symbols Legend.
400Drawer 7Automotive ComplexTed Horton AIA Architect 1980, December 11Site, Architectural, Structural, Mechanical, Plumbing, Electrical, LightingNo>2'x1' with a blueish writing, with an engine in the left corner. in the right corner is a red 42.
400CopyDrawer 7Automotive ComplexTed Horton AIA Architect1980, December 11 Architectural, Structural, Mechanical, Electrical, PlumbingNo>2'x1' purple writing. Cover page has a picture of an engine in the left side. The index is on the right
400CopyDrawer 7Automotive ComplexTed Horton AIA Architect1980, December 11 Architectural, Structural, Mechanical, Electrical, PlumbingNo>2'x1' purple writing. Cover page has a picture of an engine in the left side. The index is on the right
400Drawer 8Building 442, 445, 449 Repair RoofT.P Enterprises Inc, 2003, February 10 Re roofingYes>2'x1' Black writting. Cover page has title in the top left corner with a teepee in the bottom right corner
400Drawer 8Building 400 Safe RoomRenaissance Architects + Enineers2013, May 20*post IT remodel
Architectural, Structural, Mechanical, Electrical.
Yes>2'x1' Black writing. Title is at the top of page but it is not a cover page. has safety plans and existing floor plan on the front. Index in the top right corner.
400CopyDrawer 8Building 400 Safe RoomRenaissance Architects + Enineers2013, May 20*post IT remodel
Architectural, Structural, Mechanical, Electrical.
Yes>3'x2' Black writing. Title is at the top of page but it is not a cover page. has safety plans and existing floor plan on the front. Index in the top right corner. Folded in half
400CopyDrawer 8Building 400 Safe RoomRenaissance Architects + Enineers2013, May 20*post IT remodel
Architectural, Structural, Mechanical, Electrical.
Yes>3'x2' Black writing. Title is at the top of page but it is not a cover page. has safety plans and existing floor plan on the front. Index in the top right corner. Folded in half red Owner/ Contractor Only stamp on the front.
500Drawer 9Building 500AIA Architect1986, March 6Architectural, Structural, Mechanical, Electrical.No>2'x1' Purple writing. No cover page.
500Drawer 9Maint Build GPTCGGG Construction INC.1986????* has multiple pages from other construction plansNo>3'x2' Purple writting. COver page has the words "MAINT BUILD GPTC" in the middle center.
600Drawer 10Economic Development CenterGBW & A1989, February 28Architectural, Structural, Mechanical, Electrical.No>2'x1' Purple writing. The cover page has multiple rips with AB-Cont written in red in the right corner.
600CopyDrawer 10Economic Development Complex Graves Boynton Williams & Associates 1998, February 28Site, Architectural, Mechanical, Electrical, Plumbing No>2'x1x with purple writing. Cover page has the title in the top right corner with the index in the bottom left coner
600Drawer 11Electrical PlansGBW and A1989, February 28Electrical plansNo>2'x1' No cover page purple writting
600Drawer 11Building #600 RenovationAIP1989, November 17Architectural, & Structural for 2nd floorYes>2'x1' Purple writing. Cover page has title at the bottom with the index in the top right corner.
600CopyDrawer 11Building #600 RenovationAIP1989, November 17Architectural, & Structural for 2nd floorYes>2'x1' Purple writing. Cover page has title at the bottom with the index in the top right corner.
600 IrrigationBuilding 600 IrrigationHand Drawn1994Site *before West wing renovation >2'x1' hand drawn
700Drawer 12Health Occupations Center HTB Inc.1992, May 4Architectural, Structural, Mechanical, Electrical.No>3'x2' Purple writing GP logo in the top left corner. In the bottom right corner is a black 14 written in Sharpie.
700CopyDrawer 12Health Occupations Center HTB Inc.1992, May 4Architectural, Structural, Mechanical, Electrical.No>3'x2' Purple writing GP logo in the top left corner. In the bottom right corner is a black 7 written in Sharpie. Water Damage.
700CopyDrawer 12Health Occupations CenterHTB Inc.1992, May 4As-BuiltNo>3'x2' With purple writting. Cover page has AS-Built written in red pen in the top right hand corner
700Drawer 13Structural Vulcraft1992, August 6Structural Roofing>3'x2' purple writting. Loose paper (4 pages)
700Drawer 132005 Health Science Addition GBA2005, September 25Add on of south wing of building 700Yes>2'x1. Black writing. No cover Page
700CopyDrawer 132005 Health Science Addition GBA2005, September 25Add on of south wing of building 700Yes>2'x1. Black writing. No cover Page
700Drawer 13Alliance SteelAlliance Steel2006, June 16Steel plansYes>2'x1' Black writing. the word "Alliance" with a roof over it and a floor.
700Drawer 132005 Health Science Addition GBA2005, September 25Add on of south wing of building 700Yes>2'x1. Black writing. No cover Page but all the pages are laminated.
700CopyDrawer 132005 Health Science Addition GBA2005, September 25Add on of south wing of building 700Yes>2'x1. Black writing. No cover Page but all the pages are laminated.
700CopyDrawer 132005 Health Science Addition GBA2005, September 25Add on of south wing of building 700Yes>2'x1. Black writing. No cover Page but all the pages are laminated.
700CopyDrawer 132005 Health Science Addition GBA2005, September 25Add on of south wing of building 700Yes>2'x1. Black writing. No cover Page but all the pages are laminated.
700Drawer 13Alliance SteelAlliance Steel2006, June 16Steel plansYes>2'x1' Black writing. the word "Alliance" with a roof over it and a floor.
700Drawer 13Health Science AdditionAvenue C Glass Co.2006, April 3GlassYes>1.5'X.5 Black and white
700Drawer 13Health Occupations Center RemodelHTB Inc.1992, April 30Remodel Yes>3'x2' Folded into a small 8''x8'' paper
700Drawer 132005 Health Science Addition GBA2005, September 25Add on of south wing of building 700Yes>2'x1. Black writing. No cover Page
700Drawer 13 Room 722 Remodel2009, June 1RemodelYesSmall about 15''x 12''
700CopyDrawer 13 Room 722 Remodel2009, June 1RemodelYesTwo loose papers 2'x1'
700Drawer 13Alliance SteelAlliance Steel inc.2006, June 16Steel RenovationYes
800Drawer 141997 Fire and EMT Training FacilitySRLewis1997, February 4Architectural, Structural, Mechanical, Electrical.No>2'x1' with purple writing. Title is in the middle with the index underneath.
800CopyDrawer 141997 Fire and EMT Training FacilitySRLewis1997, February 4Architectural, Structural, Mechanical, Electrical.No>2'x1' with purple writing. Title is in the middle with the index underneath.
800CopyDrawer 141997 Fire and EMT Training FacilitySRLewis1997, February 4Architectural, Structural, Mechanical, Electrical.No>2'x1' with purple writing. Title is in the middle with the index underneath. Bottom right corner in black sharpie is the #8
800CopyDrawer 141997 Fire and EMT Training FacilitySRLewis1997, February 4Architectural, Structural, Mechanical, Electrical.No>2'x1' with purple writing. Title is in the middle with the index underneath.
800 Fire TrainingDrawer 15MetalM & O Metals2000, November 17Metal >2'x1' purple writing not cover page. first page is Painted Galv.
800 Fire TrainingCopyDrawer 15MetalM & O Metals2000, November 17Metal >2'x1' purple writing not cover page. first page is Painted Galv.
800 Fire TrainingCopyDrawer 15MetalM & O Metals2000, November 17Metal >2'x1' purple writing not cover page. first page is Painted Galv.
800 Fire TrainingDrawer 15Wall PlansWerner-Herbison-Padgett2000, December 30Wall>2'x1' purple writing. no cover page. first page is "padgenite" insulation sections
800 Fire TrainingDrawer 15Tower Burn Building PlansWerner - Herbison - Padgett 2000, OctoberWall Plans/ Structural No3'x2' Purple with no cover sheet
800 Fire TrainingCopyDrawer 15Tower Burn Building PlansWerner - Herbison - Padgett 2000, OctoberWall Plans/ Structural No3'x2' Rice Paper with no cover sheet
900Drawer 16New Law Enforcement CenterGBA Archotects2008, April 1Plumbing No2'x1' Purple writting. Cover page id foundation plumbing plans
900Drawer 16New Law Enforcement Center GBA Architects2008, May 30Mechanical PlansNo>2'x1' Purple writing. Cover page is Mechanical Legend and Abbreviations
900Drawer 16New Law Enforcement CenterGBA Archotects2008, April 1Plumbing No2'x1' Purple writting. Cover page id foundation plumbing plans
900Drawer 16New Law Enforcement CenterGBA Architects2008, May 30No.2'x1' Purple writing. cover page is site plan.
Fred EmmertTopographic SurveyHightower and Associates1996, September 16Site>2'x1' Purple writing.
FrederickDrawer 22New Farm Diesel Shop and Classroom AdditionHTB Inc.1995, June 6Architectural, Structural, Mechanical, Electrical.Yes>3'x2' purple writing. GP logo in the bottom right corner. All pages have a purple tent to them.
Parking Parking Lot/ Bus TurnaroundPhillip H Burk & Associates1988, May 12Site Yes>2'x1' with purple writing. Cover page is over all site plan, shows building 100, 200, 300, 400 with road. Red 11 in the right corner
Parking (motorcycle training) 1997 Fire and EMT Training Facility and 2005 Health-Science Addition2005, May 3SiteYes>3'x2' Folded into a 8''x8'' paper
Site 600Topographic SurveyHightower and Associates 1994SiteYes>2'x1' Purple writing. two copies rolled together
Site 900Great Plains Technology CenterLandmark Engineering2007, October 1Site No>2'x1' black writing cover page shows site location for building 900,
Site 900Great Plains Technology CenterLandmark Engineering2007, October 1Site No>2'x1' black writing cover page shows site location for building 900,
Site 900Great Plains Technology CenterLandmark Engineering2007, October 1Site No>2'x1' black writing cover page shows site location for building 900,
Site 900Great Plains Technology CenterLandmark Engineering2007, October 1Site No>2'x1' black writing cover page shows site location for building 900,